Sign In | Join Free | My isp.org.cn
China Guangdong Uchi Electronics Co.,Ltd logo
Guangdong Uchi Electronics Co.,Ltd
Guangdong Uchi Electronics Co.,Ltd Manufactuer of Varistor, Thermistor, Capacitor,Fuse & Resistor since 2006 !
Verified Supplier

12 Years

Home > Glass Fuses >

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Guangdong Uchi Electronics Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Model Number : MFS1500A

Certification : UL,VDE,KC,PSE,cUL,CQC

MOQ : 1000 Pieces

Price : 0.016 ~ 0.02 USD/Pieces

Payment Terms : T/T,Paypal

Supply Ability : 10KKPCS Per Month

Delivery Time : 5-7 Days

Packaging Details : Tape 20000PCS/Carton (Default) ; Bulk ,10000PCS/Carton

Name : Miniature Fuse 5A 250V

Speed : Fast-acting

Rated Current : 5A

Voltage : 250V

Color : Black(Default)/Red

Size : 8x4x8mm

Shape : Rectangular

Breaking Capacity : Low

IEC Designation : IEC 127-3

I2T : 78 A2.S

Contact Now

PCB Mount Circuit Protection Compact Design Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V

What is a Micro Fuse?

A micro fuse is a radial leaded subminiature fuse, offered in either a cylindrical or rectangular form factor. Micro fuses were originally designed for the U.S. Space Program. The micro fuse is made with either glass, plastic or metal bodies. They are designed to be electrically equivalent to miniature glass cartridge, fuses in a smaller package with higher tolerance to impact and vibration. Micro fuses can plug, in to a PC board mounted fuse holder. Micro fuse voltage, ratings typically range from 65 volts AC to 300 volts AC. Micro fuses with voltage ratings up to 450 volts DC are also available. Micro fuses are offered in fast acting, or time lag, versions. Micro fuses are typically built in accordance with UL 248-14, and CSA C22.2/No.248.14 or IEC 60127-3, standards. Some fuse micro series are also offered in MIL Spec, versions.

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Scope of application

This product is suitable for various kinds of electronic devices’ circuit over current protection. Widely used in industrial of Battery Charges, Consumer Electronics, Power supplies, Industrial Controllers, etc.

Standards

In accordance with IEC60127-1, IEC60127-3 Standard sheet4, GB9364.1-1997, GB9364.3-1997.

Agency Approvals

Agency Ampere Range Agency File Number
UR 50mA ~ 6.3A E340427(JDYX2)
C-UR 50mA ~ 6.3A E340427(JDYX8)
VDE 50mA ~ 6.3A 40039420
CQC 50mA ~ 6.3A CQC16012154495
PSE 50mA ~ 6.3A PSE16021073
KC 50mA ~ 6.3A SU05052-16004/16005/16006

Specification

P/N Rated current Rated voltage Max. Voltage Drop (mv) I2TMelting Integral(A2.S)
MFS0200A 200mA 250V 1700 0.04
MFS0250A 250mA 250V 1400 0.06
MFS0315A 315mA 250V 1300 0.1
MFS0400A 400mA 250V 1200 0.2
MFS0500A 500mA 250V 1100 0.35
MFS0630A 630mA 250V 650 0.5
MFS0800A 800mA 250V 240 1.3
MFS1100A 1A 250V 200 1.6
MFS1125A 1.25A 250V 200 2.4
MFS1160A 1.6A 250V 190 4.6
MFS1200A 2A 250V 170 7.9
MFS1250A 2.5A 250V 170 12
MFS1315A 3.15A 250V 150 22
MFS1400A 4A 250V 130 29
MFS1500A 5A 250V 130 78
MFS1630A 6.3A 250V 130 97
MFS1800A 8A 250V 100 290
MFS2100A 10A 250V 100 430

Dimension (mm)

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Materials

NO. Part Name Material
1 Cap Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0
2 Base Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0
3 Fuse element Alloy
4 Lead wire Copper, Tin-plated

Melting Time

% of Ampere Rating(In) Melting Time
150%* In 60 min Minimum
210%* In 30 min Max
275%* In 10 ms~3 s
400%* In 3 ms~300 ms
1000%* In 20 ms Max

Microfuse PCB Mount Holder

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection


Product Tags:

slow blow glass fuse

      

mini glass fuses

      
Cheap Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection wholesale

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangdong Uchi Electronics Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)